An industrial project by IPA that serves agriculture and promotes regional development is currently in its final stages. The intermodal terminal is located in Aydemir village, Silistra, and includes 20 silo farms, a processing center, and a service administrative building with a storage capacity of 34,000 tons of grain.
The biggest challenge of the project was the complex terrain with high groundwater levels, which was caused by the proximity to the Danube River. To ensure maximum stability and soil neutrality, we designed the silos on a pilot foundation for the proposed facilities to stand on.
Photos: Bolat Muhsin